The 1,200 ton
Now on 20' of steel blocks,
Goliath is on the ground.
1900 tons of steel to go.
The SW Sartower is gone.
Unless otherwise noted, all images are copyright of www.Sackrabbit.com      2008
Dismantling the Beast
View from inside the lower
winch house. The 3 main
pins were pushed out with
ease using a 110 ton press.
This is the turret the
operator cab once hung
on. It's on the North side
of the lower trolley.
Click on Every Picture !
December 2008
In the South section of
the yard are the
operators cab and
transport dollies that
will carry the girder to
the barge.
The  lower trolley is
now porotable and
loaded on Kamags.
A closer look at the
lower trolley, note
the size of the
person in the
foreground.
Measurements are
being verified for the
big move in between
he administration
building later in
December. The main
girder will traverse the
West side over the
Fore River train tracks
near East Howard
Street.
The North head piece sits on
Kamags awaiting transport
to the barge. The elevator is
up inside on the left.

The lighter South head piece
is also loaded on Kamags
and ready to move.