

| Dismantling the Beast |
| View from inside the lower winch house. The 3 main pins were pushed out with ease using a 110 ton press. |
| December 2008 |
| The lower trolley is now porotable and loaded on Kamags. |
| A closer look at the lower trolley, note the size of the person in the foreground. |
| Measurements are being verified for the big move in between he administration building later in December. The main girder will traverse the West side over the Fore River train tracks near East Howard Street. |