The Goliath crane
departed Quincy, MA
today at 12:00 Noon.
Towed by the Allie B,
she embarked on her
epic journey to
Romania. Here are a
few shots to hold you
over. More pix will be
posted over  the next
several days.
The 1,200 ton
"Smooth Sailing Ahead"
Click on Every Picture !
March 7, 2009
Captain Billy Hudnall
checks the local
waters in preparation
for the journey.
The final sunrise at the
Fore River Shipyard.
Quincy is no longer
Shipbuilding a ship
building mecca.
Sightseers snap
photos of Goliath
Crane as she exits
Hull Gut.
EMAIL: sackrabbit839@yahoo.com
Boston Light in the
background, Goliath
enters Boston Harbor.
"...the crowds gather the
shores to see Goliath
Crane off...
Aliie B exits Quincy, MA
as she tows the barge
Brooklyn Bridge with
Goliath Crane atop.
Goliath under the Fore
River Bridge
(AS)
Goliath on the horizon,
in Boston Harbor.
(AS
Goliath prepares to
leave the wet basin.
(AS)
Special thanks to audioshot@gmail.com
for contributing images
(AS)
Unless otherwise noted, all images are copyright of www.Sackrabbit.com      2009
Dan Ocean Towing crew
along with RDA, Norsar
and Ted Dawson
Consultants.
(AS)
Goliath heading
under the Fore River
Bridge
(AS)
A sight to see as
Goliath heads under
the Fore River Bridge

(AS)
The Harbor Express
commuter boat is
dwarfed by Goliath.
(ZK)
The crowd watches
Goliath from the
Weymouth side of
the Fore River.
(ZK)
Goliath about to leave
the Fore River Basin,
view from under the
bridge.
(ZK)
Goliath heading
under the Fore River
Bridge.
(AS)
Special thanks to zorak36@hotmail.com
for contributing images
(ZK)
Off the tip of
Hull, MA.